Panda Express (21864)
2,700 SqFt Panda Express Restaurant. The scope includes site demolition, grading, stormwater, erosion control, soil poisoning, landscaping, site concrete and foundations, asphalt paving, curb and gutter, striping, signage, site utilities, site lighting, slab on grade, masonry, steel fabrication, steel erection, roofing, prefabricated wood trusses, stainless steel, wood framing, siding, EIFS, canopies, millwork, drywall, rough/finished carpentry, metal stud framing, ACT ceiling, painting, storefront, caulking/sealants, tile finishes, doors & hardware, toilet accessories, floor mats, furnishings, HVAC, sprinkling, plumbing, electrical, & refrigeration.
Insurance Examples
(click to expand/collapse)
Name | Size | ||
Example Insurance Certificate | 15.9 KB | ||
Subcontractor Insurance Example | 389.1 KB | ||
Suppliers Insurance Example | 1.0 MB |
Reports
(click to expand/collapse)
Name | Size | ||
09 Sample GC Agreement | 619.3 KB |
Specs
(click to expand/collapse)
Name | Size | ||
03 Bid Form 8109 East Ridge TN S8-25-D7336.xls | 149.5 KB | ||
04 Bid Form 8109 East Ridge TN S8-25-D7336.docx | 24.1 KB | ||
06 Equipment Shipping and Receiving Procedures 8-18-2020 | 214.3 KB | ||
11 New Service Vendors GC Requirement 9-9-20 | 445.2 KB | ||
12 Fiberon Installation Guidelines 6-28-16 TWW only | 4.1 MB | ||
13 Panda Express 2018 Prototpye Locknet Hardware Specs | 12.8 MB | ||
14 Silikal System Install-Rev2019 Site Superintendent Check List | 74.7 KB | ||
14.1 Silikal - Panda Checklist 2019 rev7 | 10.4 MB | ||
16 Panda Auto Wok Installation Guide New Construction 20220422 | 1.4 MB | ||
17 Install Guide-WS4080 Water Softener F25404 02-17 003 | 1.5 MB | ||
18 Hobart Installation Guide PW10SeR Prep Washer | 1.4 MB | ||
Geotech Report Panda Express - East Ridge TN | 2.7 MB |