Metro Moore County Rehabilitation (21961)
consists of the installation of a Cured-In-Place liner into approximately 6,050 linear feet of 8 inch sanitary sewer pipe. The Project also calls for one (1) 8-inch mainline point repair at a service connection, approximately 72 Cured-In-Place lateral repairs, and one open cut lateral. Lastly, there are approximately 215 vertical feet of manhole lining with a polymer or epoxy-based liner and approximately 5 manhole frame and cover replacements.
ITB
(click to expand/collapse)
Name | Size | ||
Advertisement for Bids Metro Moore County 2023 Rehab Project | 92.5 KB |
Other Documents
(click to expand/collapse)
Name | Size | ||
2961-0010 - MUD 2023 Rehab Master Spreadsheet.xlsx | 39.6 KB |
Pre-Bid Sign In
(click to expand/collapse)
Name | Size | ||
Pre-Bid Sign-In Sheet | 1.4 MB |
Questions & Responses
(click to expand/collapse)
Name | Size | ||
Questions & Responses #1 | 195.4 KB |
Specs
(click to expand/collapse)
Name | Size | ||
2023 Metro Moore Co UD Rehab Project Manual | 5.1 MB |