Metro Moore County Rehabilitation (21961)

consists of the installation of a Cured-In-Place liner into approximately 6,050 linear feet of 8 inch sanitary sewer pipe. The Project also calls for one (1) 8-inch mainline point repair at a service connection, approximately 72 Cured-In-Place lateral repairs, and one open cut lateral. Lastly, there are approximately 215 vertical feet of manhole lining with a polymer or epoxy-based liner and approximately 5 manhole frame and cover replacements.