Sanitary Sewer Rehabilitation (22003)
Rehabilitating approximately 180 linear feet of 8-inch gravity sewer with Cured-in- Place Pipe (CIPP), 90 vertical feet of 48-inch diameter manhole lining, and rehabilitation of 17 laterals with CIPP. The Project also includes 12 total 8-inch open cut mainline point repairs, 35 open cut lateral replacements, and 2 manhole frame and cover replacements. The project will also include a sewer realignment consisting of a new 48-in diameter manhole, rehabilitation of 2 existing manholes on either end of the realignment, locating and connecting 4 service laterals, abandonment of approximately 210 linear feet of 8-inch pipe, and installing approximately 210 linear feet of new 8-inch pipe.
Addendum 1
(click to expand/collapse)
Name | Size | ||
Addendum No. 1 | 1.0 MB | ||
Plan Holders List-Bell Buckle 2023 SS Rehab Project (2) | 94.1 KB | ||
Questions Responses #1 | 190.8 KB |