Toyota Field Outfield Building Site Work (22069)
This project consists of selective demolition and excavation of a roughly 8,000 sf area in preparation for a future outfield building addition to the existing Madison Multi-Purpose Facility located at 500 Trash Panda Way. The project also includes the relocation of existing underground utilities within the footprint of excavation, including electrical conduit for site and field lighting, data and low voltage/fiber lines, and irrigation lines. A temporary pedestrian access scaffolding and stair will also be installed to provide the required stadium egress which bypasses the construction zone. The expected completion date is May 2, 2025.
Plans
(click to expand/collapse)
Name | Size | ||
Architectural As-Builts for Printer | 40.9 MB | ||
AV As-Builts | 11.4 MB | ||
Civil As-Builts | 13.2 MB | ||
Electrical As-Builts FINAL | 19.2 MB | ||
Fire Alarm Shop Drawings | 4.2 MB | ||
Fire Protection As-Builts | 7.1 MB | ||
Landscape Plan- Irrigation As Built | 1.9 MB | ||
Life Safety As-Builts | 3.4 MB | ||
Lighting Control Drawings | 13.9 MB | ||
Lightning Protection Shop Drawings | 1.0 MB | ||
Mechanical (Hardy) As-Builts | 4.4 MB | ||
Playing Field As-Builts | 6.3 MB | ||
Plumbing As-Builts | 10.3 MB | ||
Sanitary As-Built | 2.8 MB | ||
Seating As-Builts for Printer | 3.0 MB | ||
Site Development As-Builts | 12.4 MB | ||
SNS Shop Drawings - Updated Through ASI-020 | 7.2 MB | ||
Structural Drawing As-Builts - complete | 115.1 MB |