Battlefield Connector Multi-Use Trail (22159)

Consists of the following major elements: approximately 3,660 linear feet of 10-foot wide concrete multi-use trail, approximately 910 linear feet of 5-foot wide concrete multi-use trail, storm drainage appurtenances, and pavement striping and roadway signage.
Addendum 1 (click to expand/collapse)
This is available for download to registered users. Log in now
Name Size
Addendum No. 1 w ltr of trans 2.3 MB