Dug Gap Elementary Roof Replacement and Wall Repair (22216)
Required to tear off and replace the existing roof, flashing, gutters and downspouts with new insulation, flashing, gutters and downspouts and a TPO membrane. The project also includes the removal of the existing EIFS around the gym and replacing it with metal wall panels.
Addendum 1
(click to expand/collapse)

Name | Size | ||
25_005_Addendum_1_Combined | 4.3 MB |
Addendum 2
(click to expand/collapse)

Name | Size | ||
25_005_Addendum_2_Combined (1) | 580.8 KB |