Dug Gap Elementary Roof Replacement and Wall Repair (22216)

Required to tear off and replace the existing roof, flashing, gutters and downspouts with new insulation, flashing, gutters and downspouts and a TPO membrane. The project also includes the removal of the existing EIFS around the gym and replacing it with metal wall panels.
Addendum 1 (click to expand/collapse)
This is available for download to registered users. Log in now
Name Size
25_005_Addendum_1_Combined 4.3 MB
Addendum 2 (click to expand/collapse)
This is available for download to registered users. Log in now
Name Size
25_005_Addendum_2_Combined (1) 580.8 KB