Seventeenth Street Bridge Repairs (22222)
Removing asphalt overlay on bridge deck and approaches, repair deteriorated concrete, repair bridge joints, seal concrete deck, place asphalt overlay, and provide traffic control during the phased construction. The bridge length is approximately 94 feet. The length of resurfacing including bridge approaches is approximately 148 feet and any other work needed to complete the project as directed by the Engineer.
Addendum 1
(click to expand/collapse)

Name | Size | ||
Addendum 1 Seventeenth Street Bridge Repair | 1.6 MB |
Addendum 2
(click to expand/collapse)

Name | Size | ||
17th St_Revised Sheets_4-6B | 12.7 MB | ||
Addendum No. 2 - Seventeenth Street Bridge Repair | 118.7 KB |