AutoZone Parts (21776)
This project consists of building and site demolition, site development, clearing and preparation for the new construction of a 6,816 SF AutoZone CMU masonry building with a framed EIFS sign band. The project is anticipated to begin September 16th and be completed in 4 months.
Asbestos Report
(click to expand/collapse)
Name | Size | ||
17-Asbestos Report (version 1) | 1.4 MB |
Geo Report
(click to expand/collapse)
Name | Size | ||
19-Soils Report (version 1) | 3.0 MB |
Site Assessment
(click to expand/collapse)
Name | Size | ||
18-Phase l Report (version 1) | 27.0 MB |
Specs
(click to expand/collapse)
Name | Size | ||
44-Table of Contents (version 1) | 271.1 KB | ||
45-Required Vendor List (version 1) | 4.6 KB | ||
46-Divisions 00-01 - General Conditions (version 1) | 206.0 KB | ||
47-Division 02 - Site Work (version 1) | 355.5 KB | ||
48-Division 03 - Concrete (version 1) | 163.8 KB | ||
49-Division 04 - Masonry (version 1) | 57.7 KB | ||
50-Division 05 - Metals (version 1) | 179.6 KB | ||
51-Division 06 - Woods and Plastics (version 1) | 139.0 KB | ||
52-Division 07 - Thermal Protection (version 1) | 205.4 KB | ||
53-Division 08 - Openings (version 1) | 136.8 KB | ||
54-Division 09 - Finishes (version 1) | 243.6 KB | ||
55-Division 10 - Specialties (version 1) | 55.9 KB | ||
56-Division 15 - Mechanical (version 1) | 66.5 KB | ||
57-Division 16 - Electrical (version 1) | 161.1 KB |