Cauley Creek Park Maker Space Phase 1 (21868)

Work shall include all include materials, labor and construction of the Cauley Creek Park Maker Space Phase 1. Work includes but is not limited to selective demolition of roof and interior elements of an existing metal building, as well as installation of a new roof, installation of heating/air conditioning and construction of interior and exterior elements. The building is located at 7285 Bell Road, inside Cauley Creek Park (7255 Bell Road). The existing building previously served as a water reclamation facility, and interior equipment has already been removed.
Addendum 1 (click to expand/collapse)
This is available for download to registered users. Log in now
Name Size
2024.04.26 - MAKERSPACE PERMIT SET - PHASE 1 PROJECT MANUAL 9.4 MB
Addendum 2 (click to expand/collapse)
This is available for download to registered users. Log in now
Name Size
24-262 Addendum 2 182.4 KB
Addendum 3 (click to expand/collapse)
This is available for download to registered users. Log in now
Name Size
000110 - TABLE OF CONTENTS_ADDENDUM 3 89.7 KB
24-262 Addendum 3 166.5 KB
C-3 - PHASE 1 DETAILS - ADDENDUM 3 2.4 MB
Q&A Document 114057342622907067891 7.4 KB
Addendum 4 (click to expand/collapse)
Addendum 5 (click to expand/collapse)
This is available for download to registered users. Log in now
Name Size
24-262 Addendum 5 178.3 KB
Addendum 6 (click to expand/collapse)
Addendum 7 (click to expand/collapse)