Cauley Creek Park Maker Space Phase 1 (21868)
Work shall include all include materials, labor and construction of the Cauley Creek Park Maker Space Phase 1. Work includes but is not limited to selective demolition of roof and interior elements of an existing metal building, as well as installation of a new roof, installation of heating/air conditioning and construction of interior and exterior elements. The building is located at 7285 Bell Road, inside Cauley Creek Park (7255 Bell Road). The existing building previously served as a water reclamation facility, and interior equipment has already been removed.
Plans
(click to expand/collapse)
Name | Size | ||
2024.08.22 - MAKERSPACE CITY COMMENTS 1- PHASE 1 - DRAWINGS | 37.2 MB |