River Ridge High School Auxiliary Gym Addition (21923)

The scope of work for this project includes but is not limited to the construction of a new 29,055 +/- sf. Auxiliary Gymnasium Building. The scope of work includes but is not limited to all sitework, site & building concrete, CMU, structural & misc., metal framing & drywall and MEP systems.
Addendum 1 (click to expand/collapse)
This is available for download to registered users. Log in now
Name Size
2024-09-17 ADDENDUM 1 RRHS 1.6 MB
Addendum 2 (click to expand/collapse)
This is available for download to registered users. Log in now
Name Size
2024-09-20 ADD 2 RRHS - DRAWINGS 23.1 MB
2024-09-20 ADD 2 RRHS - PROJECT MANUAL 1.9 MB
RRHS Pre Proposal Meeting Attendance Roster 2024.0917 100.3 KB
Addendum 3 (click to expand/collapse)
This is available for download to registered users. Log in now
Name Size
2024-10-10 ADD 3 RRHS - DRAWINGS 23.2 MB
2024-10-10 ADD 3 RRHS - PROJECT MANUAL 856.3 KB