River Ridge High School Auxiliary Gym Addition (21923)
The scope of work for this project includes but is not limited to the construction of a new 29,055 +/- sf. Auxiliary Gymnasium Building. The scope of work includes but is not limited to all sitework, site & building concrete, CMU, structural & misc., metal framing & drywall and MEP systems.
ITB
(click to expand/collapse)
Name | Size | ||
RiverRidgeHS_ITB | 703.8 KB |
Specs
(click to expand/collapse)
Name | Size | ||
13-15. 2024-09-05 CD Specs-RRHS Project Manual Vol 2 | 10.7 MB | ||
14-14. 2024-09-05 CD Specs- RRHS Project Manual Vol 1 | 24.7 MB |