Volkswagen Battery Expansion RFQ (21935)

Addendum 1 (click to expand/collapse)
Addendum 2 (click to expand/collapse)
Name Size
19179-TN BASE.dgn 10.8 MB
19179-TN BASE.dwg 30.5 MB
Addendum_2_C2P Battery Project_10.02.24 175.0 KB
MEPFP RFP Addendum Documents - 36 Bay 9.27.24 2.5 MB
QA - Battery Plant Expansion - MASTER RFI Log_10.02.24 143.3 KB
R1 - Overall Site Plan (bound).dgn 59.9 MB
Sign nomenclature in the plant.ppt 6.4 MB
VW-Dock Door Sign Design_APCO 113.3 KB
VW-Interior Sign Design_APCO 1.1 MB
Addendum 2 - Expansion Walkdown Photos (click to expand/collapse)
Name Size
Ext1_Looking to Recycle 3.8 MB
Ext2_Looking to Trailer City 3.8 MB
Ext3_Looking to Gate 1 3.5 MB
Ext4_Looking to Body MEB.MQB 3.9 MB
Ext5_Battery Plant Across Ditch 3.6 MB
Ext6_Looking to Pallet Pile 3.9 MB
Ext7_Ditch and Trailer City 3.7 MB
Ext8_BP Swale South 3.8 MB
Ext9_BP Swale West 3.7 MB
Ext10_BP Swale 3.6 MB
I1_Sub Mezzanine inside BP101 4.0 MB
I2_IMP to Curb Flashing 4.2 MB
I3_BP West Wall Looking North 3.7 MB
I4_BP West Wall Looking South 4.4 MB
I5_Sub Mezzanine inside BP101_2 4.3 MB
I6_Flashing and Penetration through IMP interior 4.0 MB
I7_Roof Drain Piping and JIB crane framing below roof. 4.2 MB
I8_Roof Drain Piping with Overflow Pipe 3.6 MB
I9_Window Framing 3.6 MB
I10_Window Connection to Wind Col 3.2 MB
I11.1 Overflow Penetration with protection 3.6 MB
I11_Overflow Drain Penetration 3.3 MB
I12_Overflow Drain Exterior 3.7 MB
I13_Overflow Drain Cap 3.7 MB
I14_ Roof Drain Piping 4.0 MB
I15_Sub Mezzanine in front of Switchgear room 3.8 MB
I16_Interior Fencing for Substations 3.7 MB
I17_Sub Mezz Bussway and HV tray 4.4 MB
I18_Medium Voltage Cable Tray 3.5 MB
I19_Office Sub Mezzanine 3.8 MB
I20_Office Sub and CA Buffer Tank 4.2 MB
I21.1_Office Mezzanine from Floor 4.0 MB
I21_Mezz Office Area 3.7 MB
I22_Mezz Office Area2 3.8 MB
I23_Interior Maint Crane 4.2 MB
I24_New Office Mezzanine Area 3.7 MB
I25_Substation Mezz_New Office Area 3.7 MB
I26_Antennas to be relocated new office area 3.6 MB
I27_Antenna to be relocated new office area2 1.2 MB
I28_Sub Mezz battery storage 3.5 MB
I29_Battery Storage In Rack Sprinklers 3.6 MB
I30_In Rack Sprinklers and Branch 3.6 MB
I31.1_Dock Conduit too Low, needs to be above retention area 4.4 MB
I31_Dock Lock Conduit too Low 4.0 MB
I32.1_Dock Door Sign 3.4 MB
I32.2_Dock Man Door and Sign 3.4 MB
I32_Dock Canopies and Shelters 3.5 MB
I33_Existing Dock Trench Drain 3.8 MB
I34_Battery Storage Drain to Exterior (PVC not allowed) 3.5 MB
I35.1 Aquaswirl 4.0 MB
I35_Retention Area Valve 4.5 MB
I36.1 Dock Doors 3.5 MB
I36_Dock Door Interior 3.6 MB
I37_Cowbells to be relocated for Battery Storage Exp. 4.3 MB
I38_Roof Drain Header Turndown 4.1 MB
I39_Roof JIB Crane 3.9 MB
I40_Weld Exhaust Fan and Ducting 4.2 MB
I41_Wind Column Baseplate 4.0 MB
I42_Door and Drywall Protection 3.4 MB
I43_Draft Curtain 4.1 MB
SG1_Switchgear Room SW 3.5 MB
SG2_Switchgear Room NW 3.7 MB
SG3_Switchgear and Tray 4.3 MB
SG4_SG Tray 4.1 MB
SG5_Door and West Wall 4.1 MB
SG6_Door and Spiral Staircase 4.2 MB
SG7_Breaker Controls W 3.7 MB
SG8_Breaker Controls E 3.7 MB
Thumbs.db 13.0 KB
Addendum 2 - Switchgear Room Photos (click to expand/collapse)
Name Size
299_2316 3.6 MB
299_2317 3.8 MB
299_2318 3.5 MB
299_2319 4.2 MB
299_2320 3.7 MB
299_2321 3.6 MB
299_2322 3.4 MB
299_2323 3.5 MB
299_2325 4.1 MB
299_2326 3.6 MB
299_2327 3.7 MB
299_2328 4.3 MB
299_2329 4.1 MB
299_2330 3.1 MB
299_2331 3.7 MB
299_2332 3.7 MB
Thumbs.db 49.0 KB
Addendum 3 (click to expand/collapse)
This is available for download to registered users. Log in now
Name Size
075400-02-TPO Roofing Product Data & Shop Dwgs_AEED 7.2 MB
24-25 VW Battery Addendum No 03 compiled 7.2 MB
Addendum_3_C2P Battery Project_10.15.24 175.7 KB
Argon_CA_CW_Existing Battery.pptx 118.4 KB
Battery Plant Chiller Mechanical Drawings 5.5 MB
Chapter 8_Bid Tab_BATTERY.xlsx 39.4 KB
QA - Battery Plant Expansion - MASTER RFI Log 164.3 KB