Jamestown Municipal Airport PAPI Replacement (22261)

The work generally consists of the removal of the existing 4-box PAPIs and the installation of new 2-box PAPIs. Also included is the installation of new electrical wiring.
Plans (click to expand/collapse)
This is available for download to registered users. Log in now
Name Size
Jamestown PAPI Replacement_IFB Plans 13.8 MB