Jamestown Municipal Airport PAPI Replacement (22261)
The work generally consists of the removal of the existing 4-box PAPIs and the installation of new 2-box PAPIs. Also included is the installation of new electrical wiring.
ITB
(click to expand/collapse)

Name | Size | ||
Advertisemnt for Bids | 98.1 KB |
Specs
(click to expand/collapse)

Name | Size | ||
Jamestown PAPI Replacement_IFB Specs | 7.1 MB |